With the “Centrum“ D1 motorway junction, a 767-metre long bridge structure, the cross-sections as well as its longitudinal and lateral inclinations change continuously.
PERI UP supporting scaffold transferred the vertical and horizontal loads from a height of over 15 m safely into the ground, and the required access means was also integrated. Through its modular structure and metric grid arrangement, the load-bearing system could be optimally adapted to deal with all forces.
Using hinged and friction-locked connections with articulated walers and universal couplings, the latticed framework consisting of GT 24 formwork girders, SRU steel walers and SLS heavy-duty spindles could be accurately adapted to the structure´s geometry and falsework.